Thyssenkrupp Levant Stair Lift Installation Manual Top -
The Levant utilizes an aluminum rail that must be securely joined before mounting it to the stairs. Step 1: Position the Lower Section
: Factor in the extension needed for the seat to safely swivel at the top landing.
Insert the steel joint alignment blocks into the designated internal chambers of the rail profiles. Slide the two sections together.
These instructions are from the official safety chapter of the Levant user manual [12†L3-L42]. thyssenkrupp levant stair lift installation manual top
: The process begins with measuring and cutting the aluminum track to fit the specific staircase length. Stand feet are positioned and measurement clearances from the step nose and back wall are verified. The rail sections are then spliced together and secured to the stairs using lag bolts for each stand foot. Electrical Integration
: Fasten the retaining bolts to lock the seat in place. Check the leveling of the seat; the Levant allows for minor seat tilt adjustments to ensure the rider sits completely level, regardless of the stair pitch.
Ensure the upper mechanical stop is firmly bolted to prevent the carriage from over-traveling the rail. 2. Electrical & Charging (Top Station) The Levant utilizes an aluminum rail that must
The Levant operates on a 24V DC battery circuit charged continuously via the rail charging strips. Tools and Equipment Required
Check for any unusual noises or jerky movements.
However, a successful installation relies heavily on following the precisely. A proper installation ensures the safety of the user, optimal performance of the lift, and compliance with manufacturer warranties. Slide the two sections together
Try to operate the directional toggle. The lift must not move while the seat is turned away from the travel position. Limit Switches
The ThyssenKrupp Levant user manual is a critical document that every owner must read carefully before using the stair lift. The manual warns: .