Push the latching lever into place or tighten the captive screws to lock the PSU in the bay.
Insert the AC power cord firmly into the IEC inlet on the first Power Supply Unit (PSU 1). Secure it using the wire retaining clip to prevent accidental disconnects. Connect the plug to the external AC power source grid.
The 7250 IXR-X series typically boots from an . 7250 IXR Hardware Documentation Hub nokia 7250 ixr x1 installation guide
When the boot sequence completes, you will be prompted with a login screen. The default credentials for Nokia Service Router Operating System (SR OS) initialization are typically: admin Password: admin
: Secure the chassis into a standard 19-inch rack using the provided mounting brackets and screws. Push the latching lever into place or tighten
Open the shipping carton and verify the following components are included:
The IXR-X1 is typically installed in standard 19-inch equipment racks. Physical Dimensions : 1RU, 4.5 cm (1.75 in). : 44.45 cm (17.5 in). : 54.6 cm (21.5 in). Environmental Requirements Connect the plug to the external AC power source grid
Route fiber optic cables and Ethernet cables through the cable management system. Ensure cables are not strained or kinked. 5.2 Connecting Power Verify again that the chassis is grounded. Connect Power Cables: Connect the cables to the PSUs.
The rear panel contains the field-replaceable units (FRUs) responsible for power and cooling. Two slots supporting 1+1 redundancy.
: Access the Nokia MD-CLI through the console port to manually configure IP addresses and routing protocols.
Once powered up, you can populate the interface slots based on your architectural design. Installing Transceiver Modules
© 2023 SoftInova
Subscribe now to keep reading and get access to the full archive.