Clean stainless steel surfaces with specialized cleaner; wipe IR sensor windows.
Before handing the installation over to the client, run through the standard startup sequence. Initial Power-Up
Ensure data lines are separated from high-voltage AC lines to prevent signal interference. Access Control and Peripheral Integration gunnebo speedstile fl installation manual
Check the glass leaves, side panels, and top lids for scratches, chips, or fractures. Primary Inventory Checklist Master/Slave/Center Cabinet enclosures
| Error Code / Symptom | Probable Cause (from manual) | Solution | | :--- | :--- | :--- | | | Motor thermal overload tripped or power supply fuse blown. | Wait 10 minutes for reset or replace 5A fuse on the power board. | | Flaps close on user (hitting shin) | IR beam "B3" misaligned or dirty. Lane too wide (over 1000mm). | Clean the IR lens with microfiber cloth. Re-run Auto-Tune calibration. | | Continuous alarm sound | Floor vibration causing sensor bounce. | Install rubber vibration dampening pads under the pedestal (not included, but recommended in appendix C of manual). | | Unit doesn't respond to card reader | Wiring polarity reversed on J5-J8 (Tip vs. Ring). | Swap wires on the "Card In" and "Card GND" terminals. | | Flaps open slowly | Hydraulic damper failure or low temperature (<0°C). | Refer to manual for damper replacement (Part # GSF-DMP-01). Add lane heater kit. | Access Control and Peripheral Integration Check the glass
Route the AC power cable into the master cabinet's power supply unit (PSU).
Connect the normally open (NO) contact from the card reader/biometric relay to the main controller board terminal marked IN1 or OPEN_A . | | Flaps close on user (hitting shin)
Reposition the cabinets, insert the expansion anchors, and use a spirit level on the top chassis rail to verify vertical and horizontal plumbing. Insert steel shims under the baseplate if adjustments are needed.
Remove all tools, packing foam, and hazards from the lane pathway.
Align them using a laser level or chalk line to ensure perfect parallelism between cabinets. Mark the anchoring holes and conduit exit points. Step 2: Drilling and Anchoring